Pasaribu, F., Mudaryoto , J. W., & Pasaribu, R. H. (2026). Pipe Stress Analysis of the Steam Pipe of Project Tidore Power Plant (2 X 4 MW) Using CAESAR II . Recent in Engineering Science and Technology, 4(01), 22–37. https://doi.org/10.59511/riestech.v4i01.129